Interface risk in construction
Interfaces are points of interaction between two or more aspects of a project:
- Physical interfaces occur where different contractors are engaged on the same project, particularly where their respective works interact or connect in some way.
- Relationship interfaces occur between different stakeholders on a project, such as; contractors, local community groups, regulatory bodies, the client, and so on.
Interface risk, and the failure to manage it effectively, is a common cause for problems on construction projects, giving rise to:
- Delays in completion.
- Claims for damages.
- Stakeholder complaints.
- Loss of profit.
- Industrial action.
- Regulatory infringements.
- Reputational damage.
Managing interface risks between the contracting parties typically involves contractual provisions which might include collaboration and co-operation clauses, clear and complete design documents and specifications, fit for purpose clauses, insurances and warranties, variation clauses and so on.
Interfaces between parties without a contractual relationship can be less straight-forward, but may involve:
- Alliancing and partnering agreements to encourage stakeholders to tackle interfaces early on, and promote a no-blame culture.
- Regular meetings between stakeholders to identify and manage new interfaces.
- Stakeholder mapping and stakeholder management strategies to predict how the project will affect stakeholders and how they can affect the project.
- Identifying and assessing third party dependencies.
It is important that responsibility for managing interfaces is allocated to a specific individual or organisation, as they can often fall between responsibilities or contracts. This is particularly important on large or complex projects where there may be a very large number of interfacing organisations, contracts and packages of work.
New technologies such as Building Information Modelling (BIM) can help identify both soft and hard interface risks, as well as encouraging effective collaboration between stakeholders on a project. Clash avoidance and clash detection should be carried out as an integral part of the design and construction process, from defining standard methods and procedures and establishing a BIM volume strategy, through to specialist design and the creation of a virtual construction model and should continue during the construction phase itself as models are updated with as-constructed information.
[edit] Related articles on Designing Buildings Wiki
- A solution to handle large and complex construction projects: Interface Management.
- Code of practice for project management.
- Conflict of interest.
- Design management.
- Method statement.
- Programme.
- Project manager.
- Receptor.
- Risk assessment.
- Risk in building design and construction.
- Risk management.
- Stakeholders.
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.